Construction of Lift and DDA Works, Swanmead School, Ilminster

  • Client: Swanmead School
  • Contract: JCT Minor Works
  • Construction of lift and lift well.
  • Construction of ramps and new handrails within the school quadrangle
  • Limited access was available throughout the works which were in the centre of the school and had to be arranged to minimise disruption to the school.
  • No vehicular access was available to the site works.