Construction of Lift and DDA Works, Swanmead School, Ilminster
- Client: Swanmead School
- Contract: JCT Minor Works
- Construction of lift and lift well.
- Construction of ramps and new handrails within the school quadrangle
- Limited access was available throughout the works which were in the centre of the school and had to be arranged to minimise disruption to the school.
- No vehicular access was available to the site works.